Cost of delay: indicative estimate
Your inputs
One month's delay, likely cost
AED 44,300 Range AED 43,300 to AED 45,400
Over 3 months of delay: likely AED 132,900, between AED 129,900 and AED 136,200.
Rates last reviewed: October 2026, by Philip Chapman
| Each month of delay | Low | Likely | High |
|---|---|---|---|
| Rent or hotel while you wait | AED 28,600 | AED 28,600 | AED 28,600 |
| Interest on money borrowed for the build | AED 8,300 | AED 8,300 | AED 8,300 |
| Price escalation on the work still to build | AED 6,400 | AED 7,400 | AED 8,500 |
| Contractor's extended site costs | – | Not included | – |
| Professional fees that continue | – | Not included | – |
| Total per month | AED 43,300 | AED 44,300 | AED 45,400 |
| Total for the delay | AED 129,900 | AED 132,900 | AED 136,200 |
If the delay is the contractor's responsibility, the contract may give you delay damages or other remedies, which this does not deduct. What applies depends on the contract and the records; take advice from a UAE-qualified lawyer. Our guide to what to do when a villa build stalls sets out the first ten days.
Showing the example below. Switch on JavaScript to change the inputs.
An indicative estimate, not a claim valuation. Each line is rounded to the nearest AED 100 and the totals are the sum of the lines. Excludes storage, travel, lost rental income from the finished villa and the cost of disputes. Sources and assumptions
Keep or discuss this result
Sources. Rents from Engel & Völkers (Property Monitor data); base rate from the Central Bank of the UAE; construction inflation from Turner & Townsend and Currie & Brown (via PRASOON); preliminaries from Turner & Townsend. Full sources, assumptions and method: eastbridgestrategicpartners.com/tools/delay-cost-estimator/#sources
Eastbridge Strategic Partners · Client-side project management for private villas in Dubai and Abu Dhabi · philip@eastbridgestrategicpartners.com · +971 56 744 0057 · eastbridgestrategicpartners.com
How the estimate works
The short answer: a month's delay on a villa build costs the owner the rent or hotel they are still paying, the interest on money already borrowed, the rise in the price of the work not yet built and, if the delay is on the owner's side, the contractor's time-related site costs. Fees that run by the month come on top. The estimator adds those up, line by line.
- Rent or hotel. The monthly figure you enter. The default is Engel & Völkers' average Dubai rent for a four-bedroom villa, AED 343,461 a year as of May 2026 (three bedrooms AED 212,220; five bedrooms AED 546,924), from Property Monitor data.[1] It is the same in every column.
- Finance. Money borrowed multiplied by the annual rate, divided by twelve. The default rate is the Central Bank of the UAE's base rate, raised to 3.9% from 17 September 2026.[2] It is the floor for overnight money-market rates, not what a bank charges for a loan, so enter your own rate.
- Escalation. The value of the work still to build, multiplied by a month's construction inflation. For 2026, Turner & Townsend forecast 4% in Dubai and 5% in Abu Dhabi,[3] and Currie & Brown about 3% for the UAE.[4] The low column uses 3%, the high column Turner & Townsend's figure for the emirate, and the likely column the midpoint.
- Contractor's extended site costs. Off by default. If the delay is on the owner's side (late decisions, late design information, late payment), the contractor may be entitled to more time and its time-related costs. The estimator spreads Turner & Townsend's preliminaries, 12% of construction cost on a 2,500 m² project in Dubai and 15% in Abu Dhabi,[3] over a construction phase of 8–14 months:[5] the shortest build gives the highest monthly figure. Treat it as an order of magnitude; the contract and the records decide what is actually due.
- Professional fees. Whatever monthly fees continue under your appointments. There is no published benchmark, so nothing is assumed.
From the builder's side, the cost of delay was always easier to see from the contractor's chair than from the owner's: site cabins, supervision and plant hire run by the week whether work moves or not. The owner's costs are quieter but often larger, because rent and finance never stop. When a build has stalled, our guide to what to do when a villa build stalls covers the first ten days, and a stalled project review puts a number on the way back.
Questions
How much does a month's delay cost on a villa build in Dubai?
Who pays for delay on a construction project?
How much does construction inflation add each month?
What should I do if my villa project is delayed?
Does this include delay damages from the contractor?
Sources
- Engel & Völkers, Average villa rental prices in Dubai (2026), data from Property Monitor, updated 21 May 2026. www.engelvoelkers.com
- Central Bank of the UAE, CBUAE raises the Base Rate by 25 basis points (16 September 2026). centralbank.ae
- Turner & Townsend, UAE market intelligence 2025: construction cost performance (inflation, preliminaries). marketintelligence.turnerandtownsend.com
- PRASOON, Owner's representative vs project manager in the UAE (citing Currie & Brown). prasoon.design
- Real Estate Club Dubai (property information website), Villa architects in Dubai: FF&E, approvals and timelines. realestateclubdubai.com
Rates last reviewed October 2026 by Philip Chapman. This page gives general information, not financial, legal or engineering advice.
Other tools
- Villa build and renovation cost calculatorLow, likely and high costs with fees, approvals, contingency and a timeline.
- Renovate or rebuild?Renovation against knock-down-and-rebuild, per sq ft of finished space.
- Stage payment plannerA build budget spread over a typical payment schedule, month by month.
- All toolsFree planning tools for villa owners, each with its sources.
Want a second pair of eyes on the numbers?
Philip replies personally within one working day. The first conversation is free. Nothing you send is published, and it is shared only with the service providers named in our privacy notice.