Contracts, cost plans and site meetings come with their own language. Knowing what a provisional sum, an extension of time or a defects liability period actually means, and who is responsible for it, is the first step to keeping control of your budget and programme.
Each definition says who usually does what: the owner, the owner's DM-registered consultant, the contractor, or Eastbridge as your client-side project manager. This is general information, not legal or technical advice for your project. For contract questions, take advice from a UAE-qualified lawyer.
No terms match your search. Try a shorter word, or ask us.
A
- Advance payment guarantee
A bank guarantee the contractor provides in return for an up-front payment from the owner, usually at mobilisation. If the contractor fails to perform before the advance has been earned back, the owner can call on the guarantee. The advance is normally recovered by deducting an agreed share from each interim payment, and the guarantee should reduce as it is repaid. Check the wording, the issuing bank and the expiry date before releasing any money.
Read more: UAE villa construction contractsCost and programme control
See also: Performance bond, Mobilisation, Interim payment
- Affection plan
A Dubai plot document setting out the plot number, dimensions, area and the planning controls that apply, such as permitted use, height and setbacks. It is one of the first things the owner's consultant needs before design can start, and one of the first things to read before you buy a plot. Which body issues it depends on where the plot sits. Make sure the copy you rely on is current.
Read more: Plot due diligenceBuying a villa plot: the checks
See also: Setback, Plot coverage, Master developer
- Arbitration
A private way of resolving a contract dispute, decided by one or more arbitrators instead of a court. Many construction contracts in the UAE choose arbitration, and the clause usually names the rules and the seat. It can be slow and costly, so on a villa it is a last resort after negotiation and other routes have failed. Whether and how to start a claim is a question for a UAE-qualified lawyer.
Read more: Variations, delays and claimsUAE villa construction contracts
See also: Extension of time, Final account
- As-built drawings
Drawings that record the villa as it was actually built, including every change made on site, the true routes of pipes, cables and drainage, and the final positions of equipment. They are prepared on the contractor's side and checked by the owner's consultant. Owners need them for maintenance, future alterations and resale. Make their delivery a condition of handover, not a promise for later.
Read more: Snagging and handoverVilla snagging checklist
See also: Handover, Shop drawings, Commissioning
B
- Bill of quantities (BOQ)
A document that breaks the work into itemised quantities, such as cubic metres of concrete or square metres of tiling, so that contractors can price the same scope line by line. A good BOQ makes bids comparable and gives agreed rates for valuing variations. A poor one, with gaps or vague items, invites claims later. On a lump sum contract, check what the contract says about errors in the quantities.
Read more: Consultant and contractor selectionHow to choose a villa contractor
See also: Lump sum, Remeasure, Quantity surveyor
- Building Completion Certificate
The certificate the permitting authority issues once the finished villa has passed its completion inspection. In Dubai's residential procedure, a joint inspection by the authority's departments, including Civil Defence where needed, comes before the certificate, and service connections follow it. In Dubai's residential procedure, service connection follows the completion certificate, so it should be a defined milestone in the contract and the programme, not an afterthought.
Read more: Snagging and handoverHow to build a villa in Dubai
See also: Building permit, Civil Defence approval, DEWA connection
- Building in Dubai platform
The Dubai government digital platform launched in October 2023 that brings together building services from land and design through permits, construction, completion, connection and later alterations. Applications are made by the registered consultant or contractor, not usually by the owner. Owners rarely log in themselves, but it helps to know where an application sits and what the authority has asked for.
Read more: Design and approvalsHow to build a villa in Dubai
See also: Building permit, Dubai Municipality, Consultant
- Building permit
The authority's approval to start construction, issued with stamped drawings. In Dubai it comes from Dubai Municipality, Trakhees or the Dubai Development Authority, depending on where your plot sits. In Abu Dhabi, the municipalities issue permits through TAMM. The owner's registered consultant prepares and submits the application, and the contractor must have the permit before work starts. Building without one can lead to enforcement action by the authority; take advice from a UAE-qualified lawyer if work has started without one.
Read more: Design and approvalsHow to build a villa in DubaiDubai villa building permits, step by step
See also: No objection certificate, Dubai Municipality, Trakhees, Dubai Development Authority, TAMM
- Built-up area (BUA)
The total covered floor area of a villa, usually measured to the outside of the walls and including every floor. Definitions differ between authorities and master developers, especially for terraces, balconies, basements and roof structures, so always ask which definition a figure uses. Build costs are commonly quoted per square foot of BUA, which makes the definition matter when you compare quotes.
Read more: Villa construction cost in DubaiCost and programme control
See also: Gross floor area, Plot coverage, G+1
C
- Civil Defence approval
The fire and life safety approval for a building, covering items such as fire alarms, escape routes and fire-rated construction. In Dubai, Civil Defence is linked to the unified building permit window, and it joins the completion inspection where needed. The owner's consultant designs to meet the requirements and the contractor installs the systems. A failed inspection here can hold up the completion certificate.
Read more: Design and approvals
See also: Building Completion Certificate, Building permit, MEP
- Commissioning
Starting up and testing the villa's systems, such as air conditioning, water pumps, pool plant, lighting controls and fire alarms, to prove that they work as designed. It should be done before handover, with results recorded and witnessed. Owners should receive the test results, operating manuals and warranties. A villa that looks finished but has not been properly commissioned is not finished.
- Consultant
In Dubai, the engineering consultancy the owner appoints to design the villa, apply for approvals and, where appointed to, oversee the works and administer the contract. Under Dubai Law No. 14 of 2025, only consultancies registered with Dubai Municipality may practise or present themselves as engineering consultants, including in free zones. Eastbridge is not a consultancy: we represent the owner, alongside the owner's DM-registered consultant.
Read more: Owner's rep vs project manager vs consultantConsultant and contractor selection
See also: Owner's representative, Contract administration, Dubai Municipality
- Contingency
Money set aside in the owner's budget for the unknown: ground conditions, design changes, price rises and decisions not yet made. Real Estate Club Dubai suggests 10 to 15 per cent for villa builds. Keep the contingency in the owner's budget, not hidden in the contractor's price, and track every draw on it. A contingency that is spent by the time the frame is up is an early warning.
Read more: Cost and programme controlVilla construction cost in DubaiVilla renovation cost in Dubai
See also: Provisional sum, Variation, Value engineering
- Contract administration
Running the building contract day to day: issuing instructions, valuing payments, assessing variations and delay claims, and recording completion. The contract names who does this, often the owner's consultant or engineer. Most villa disputes come from contracts that nobody administered properly, not from bad contracts. Eastbridge advises the owner on commercial and contractual matters alongside whoever holds that role.
Read more: Variations, delays and claimsUAE villa construction contracts
See also: Variation, Extension of time, Interim payment
- Critical path
The longest chain of dependent activities in a construction programme. A delay to any activity on it delays completion unless something else is accelerated. Knowing the critical path tells an owner which late decisions, such as approving tiles or windows, will actually delay the villa and which will not. Delay claims are usually argued on whether an event affected the critical path.
Read more: Cost and programme controlVariations, delays and claimsHow long it takes to build a villa in Dubai
See also: Programme, Extension of time, Liquidated damages
D
- Daywork
Work paid on the time and materials actually spent, at agreed hourly and material rates, instead of at a measured or fixed price. It is used for small, unforeseen items that are hard to price in advance. Daywork sheets should be signed off on the day the work is done. Without that discipline, daywork is one of the easiest ways for a final account to grow.
Read more: Variations, delays and claimsCost and programme control
See also: Variation, Final account, Remeasure
- Decennial liability
A ten-year liability under the UAE Civil Transactions Law. The contractor and the architect who designed and supervised the work can be jointly liable for collapse, total or partial, and for defects that threaten the building's stability, usually from handover. Commentators note that the parties cannot contract out of it. It is separate from the shorter defects liability period. Take advice from a UAE-qualified lawyer on any claim.
Read more: UAE villa construction contracts
See also: Defects liability period, Taking over, Warranties and guarantees
- Defects liability period
A period after completion, set in the contract and often a year, during which the contractor must return and put right defects that appear. Some contracts call it the defects notification period. Retention or a bond is often held until it ends. Keep a dated list of defects as they appear and report them in writing, well before the period expires.
Read more: Snagging and handoverVilla snagging checklist
See also: Retention, Snagging, Decennial liability
- Department of Municipalities and Transport (DMT)
The Abu Dhabi government department that regulates planning and building in the emirate, including the private villa regulations it amended in September 2025. Building permits are issued by the municipalities through the TAMM platform. In August 2025 DMT allowed contractors to apply directly for some minor works, such as small extensions, pools, canopies and fences.
Read more: Design and approvalsAbu Dhabi villa permits through TAMM
See also: TAMM, Setback, Building permit
- Design development
The stage where the agreed concept is worked up into coordinated architectural, structural and MEP designs with enough detail to apply for approvals and to price. Most cost is committed here, long before anyone starts on site. It is the best moment to test the design against the budget, because changes are cheap on paper and expensive once work is built.
Read more: Design and approvalsCost and programme control
See also: Value engineering, Specification, MEP
- DEWA connection
Connecting a Dubai villa to the electricity and water network of the Dubai Electricity and Water Authority (DEWA). In Dubai's residential procedure, permanent connection follows the completion certificate. Applications and load calculations sit with the consultant and contractor, but owners feel any delay, because a finished villa without power cannot be commissioned or lived in. In Abu Dhabi, connections are made by the local distribution company.
Read more: Snagging and handover
See also: Building Completion Certificate, Commissioning, MEP
- Dubai Building Code
Dubai's unified building code, setting technical requirements for design and construction across the emirate. Villa designs are checked against it during the permit process, and in August 2026 Dubai Municipality announced an AI system to check villa drawings against the code, to be rolled out in phases. Your consultant designs to the code. Owners mainly need to know that a design that does not comply will not be approved.
Read more: Design and approvalsDubai villa building permits, step by step
See also: Building permit, Dubai Municipality, Consultant
- Dubai Development Authority (DDA)
One of the authorities that can issue building permits in Dubai, regulating planning and building in a number of the emirate's development and free zones. It is part of Dubai's unified building permit window with Dubai Municipality and Trakhees. Which authority covers your villa depends on where your plot sits, so confirm it with your consultant or master developer early.
Read more: Design and approvals
See also: Dubai Municipality, Trakhees, Building permit
- Dubai Municipality (DM)
The Dubai government body responsible for building permits and inspections across much of the emirate, and for registering engineering consultancies and contractors. It also publishes guidance contract forms for private villas, in Arabic. Some plots fall under Trakhees or the Dubai Development Authority instead, depending on where the plot sits, so check which authority applies before design starts.
Read more: How to build a villa in DubaiDesign and approvalsDubai villa building permits, step by step
See also: Building permit, Consultant, Dubai Building Code
E
- Extension of time (EOT)
More time granted to the contractor to finish, because of a delay the contract says is not the contractor's risk, such as late owner instructions or variations. It moves the completion date and protects the contractor from liquidated damages for that period. A valid claim normally needs a timely notice, evidence and an updated programme. Owners who keep good records and decide promptly give contractors little to claim.
Read more: Variations, delays and claimsUAE villa construction contracts
See also: Liquidated damages, Critical path, Programme
F
- FF&E (Furniture, fixtures and equipment)
The loose furniture, decorative lighting, soft furnishings, art and some appliances that make a villa liveable. At the top of the market it can be a large share of the total spend, yet it is often left out of early budgets. Decide early whether FF&E sits in the contractor's scope, an interior designer's scope or with the owner, and budget for it separately.
Read more: Cost and programme controlVilla construction cost in Dubai
See also: Fit-out, Prime cost sum, Contingency
- FIDIC
A family of international standard construction contracts published by the International Federation of Consulting Engineers. The Red Book is for work designed by the owner's team and the Yellow Book for contractor design. FIDIC forms are widely recognised in the region, usually with heavy amendments. For a private villa they can be more than is needed, and Dubai Municipality's guidance forms or a bespoke contract may suit better.
Read more: UAE villa construction contracts
See also: JCT, Taking over, Contract administration
- Final account
The agreed total of everything owed under the building contract once the work is done: the contract sum, plus or minus variations, adjustments to provisional sums, remeasured quantities and settled claims. Agreeing it promptly closes the contract. Left open, it becomes a negotiation months after the team has moved on, and the owner has lost most of their leverage.
Read more: Cost and programme controlVariations, delays and claims
See also: Variation, Provisional sum, Retention
- Fit-out
The interior work that turns a built shell into a finished home: joinery, kitchens, bathrooms, flooring, ceilings, lighting and decoration. On a new villa it is usually part of the main contract. On a renovation it may be the whole project. Fit-out is where specification choices and late decisions do most damage to cost and programme, so settle the finishes early.
Read more: Villa renovation project managementVilla construction project managementVilla renovation cost in Dubai
See also: FF&E, Specification, Prime cost sum
G
- G+1
Shorthand for a building's height: ground floor plus one upper floor. You will also see G+2, B+G+1 for a basement, and +R for a roof level with an enclosed structure such as a stair or majlis. The permitted height for a plot is set by its planning regulations and the master developer's guidelines. Check it before you plan the accommodation you need.
Read more: Plot due diligenceBuying a villa plot: the checks
See also: Affection plan, Plot coverage, Built-up area
- Gross floor area (GFA)
A planning measure of floor area, used to control how much can be built on a plot. What it includes and excludes, such as basements, parking or plant space, depends on the authority's and the master developer's definitions, so it can differ from the built-up area for the same villa. Planning limits are usually set in GFA. Confirm which measure each figure uses.
Read more: Plot due diligence
See also: Built-up area, Plot coverage, Affection plan
H
- Handover
The point at which the contractor hands the finished villa to the owner, with keys, test certificates, manuals, warranties and as-built drawings. It usually coincides with practical completion or taking over under the contract, and it starts the defects liability period. Do not accept handover with a long snagging list and no agreed dates for clearing it.
Read more: Snagging and handoverVilla snagging checklist
See also: Snagging, Practical completion, As-built drawings
I
- Interim payment
A stage or monthly payment to the contractor during the build, based on work completed and materials on site. The contractor applies, the owner's consultant checks the application against progress and contract rates, and the approved amount is paid less retention and other agreed deductions. Paying ahead of the work, or paying unchecked applications, gives away the owner's main leverage.
Read more: Cost and programme controlUAE villa construction contracts
See also: Retention, Advance payment guarantee, Contract administration
J
- JCT
The Joint Contracts Tribunal, which publishes the standard building contracts most used in the United Kingdom, from minor works to design and build. JCT contracts use practical completion and a rectification period instead of taking over and defects notification. Our founder built under JCT contracts for 21 years. They are rarely used for UAE villas, but British owners often recognise the concepts.
Read more: UAE villa construction contracts
See also: FIDIC, Practical completion, Defects liability period
L
- Letter of intent
A letter telling a contractor that the owner intends to award the contract, sometimes allowing limited early work before the full contract is signed. It can save time but carries risk: if the contract is never agreed, it may be unclear what has been promised and what is owed. Keep it short, capped in value and time-limited, and get the full contract signed quickly. Have a UAE-qualified lawyer review the wording before it is signed.
Read more: Consultant and contractor selectionUAE villa construction contracts
See also: Tender, Mobilisation, Lump sum
- Liquidated damages (LDs)
A pre-agreed amount, usually per day or week, that the contractor pays the owner if the villa is finished late without a valid extension of time. The rate should be set in the contract, often with a cap. How enforceable liquidated damages are, and whether a court may adjust them, is a matter of UAE law, so take advice from a UAE-qualified lawyer.
Read more: Variations, delays and claimsUAE villa construction contracts
See also: Extension of time, Programme, Critical path
- Lump sum
A contract where the contractor agrees a fixed price for a defined scope of work, so the risk of quantities is largely the contractor's. It is only as fixed as the drawings and specification behind it: gaps become variations. Many villa contracts mix a lump sum for most of the work with remeasurable items and provisional sums. Know which items sit where.
Read more: UAE villa construction contractsCost and programme control
See also: Remeasure, Provisional sum, Variation
M
- Master developer
The company that planned and controls a community, such as Nakheel on Palm Jumeirah, Emaar in Emirates Hills, Meraas on Jumeirah Bay, Aldar on Saadiyat and Modon on Hudayriyat. It sets design guidelines and issues its own NOCs before the authority will process a permit. In Nakheel communities, renovation and extension approvals start with an NOC application through Nakheel's portal.
Read more: Plot due diligenceDesign and approvalsNakheel NOC for villa renovations
See also: No objection certificate, Affection plan, Setback
- MEP (Mechanical, electrical and plumbing)
The building services of a villa: air conditioning and ventilation, power, lighting, data, water supply, drainage, and often pool plant and fire systems. In a Gulf villa MEP is a large part of the cost and the main source of problems after handover. Ask for coordinated MEP drawings before work starts, and insist on proper testing and commissioning before you accept the villa.
Read more: Site visits and reportingSnagging and handover
See also: Commissioning, Shop drawings, DEWA connection
- Method statement
A document from the contractor describing how a particular piece of work will be carried out safely and correctly: sequence, equipment, materials, labour, checks and safety measures. Typical examples are excavation and shoring, waterproofing and pool construction. The owner's consultant reviews it. For owners, a well-written method statement is a good sign of a contractor who has thought the job through.
Read more: Site visits and reporting
See also: Shoring, Shop drawings, Request for information
- Mobilisation
The contractor's setting up on site at the start of the works: hoarding, site offices, welfare, temporary power and water, and bringing in plant and labour. Mobilisation costs usually sit in the preliminaries, and an advance payment is often tied to it. Agree in the contract what must be in place, and by when, before mobilisation is treated as complete.
Read more: Villa construction project management
See also: Preliminaries, Advance payment guarantee, Programme
N
- No objection certificate (NOC)
A written confirmation from an authority, master developer or utility that it has no objection to a proposed design or piece of work. A Dubai villa permit usually needs several, collected through the unified building permit window. In Nakheel communities, renovations and extensions start with a Nakheel NOC application. The consultant gathers most NOCs. Missing ones are a common cause of early delay.
Read more: Design and approvalsHow to build a villa in DubaiNakheel NOC for villa renovations
See also: Building permit, Master developer, Civil Defence approval
- Nominated subcontractor
A specialist, such as a pool, lift or smart home installer, chosen by the owner's side but employed by the main contractor. Nomination gives the owner control over who does important work, but it can blur responsibility: when the specialist is late, the main contractor may claim it is not their fault. Be clear in the contract who carries that risk.
Read more: Consultant and contractor selectionUAE villa construction contracts
See also: Subcontractor, Prime cost sum, Extension of time
O
- Owner's representative
An independent adviser who acts only for the owner, paid only by the owner, managing the project on their behalf: budget, programme, team selection, progress reporting, payments and decisions. Eastbridge is a client-side project manager in this sense. We represent the owner alongside the owner's DM-registered consultant and the contractor, and do not replace the consultant of record that the authorities require.
Read more: Owner's representationOwner's rep vs project manager vs consultant
See also: Consultant, Contract administration, Quantity surveyor
P
- Performance bond
A guarantee, usually from a bank, that the owner can call on if the contractor fails to perform the contract, for example by abandoning the site. The amount is a percentage of the contract sum agreed in the contract. Check whether the bond is on demand or conditional, who issues it, and when it expires: a bond that lapses before completion is worth little.
Read more: UAE villa construction contractsStalled project rescueStalled villa construction: the first ten days
See also: Advance payment guarantee, Retention, Taking over
- Plot coverage
The share of the plot that the building's footprint may cover, usually expressed as a percentage of plot area and set by the planning regulations or the master developer's guidelines. Together with height limits and setbacks, it decides how large a villa a plot can take. Check it before you buy, rather than discovering at design stage that your brief will not fit.
Read more: Plot due diligenceBuying a villa plot: the checks
See also: Setback, G+1, Affection plan
- Practical completion
The point at which the work is complete apart from minor items that do not stop the owner using the villa. It is the term used in UK and some other contracts. It usually triggers release of part of the retention, stops liquidated damages and starts the defects period. The contract should say who confirms it, typically the owner's consultant, and on what basis.
Read more: Snagging and handoverVilla snagging checklist
See also: Taking over, Handover, Retention
- Preliminaries
The contractor's costs of running the site rather than building the villa itself: site management, temporary works, welfare, insurances, security, plant and cleaning. Turner & Townsend has put contractor preliminaries at 12 to 14 per cent in Dubai. Because they are time-related, they are central to the cost of delay, and they deserve close reading when you compare bids.
Read more: Consultant and contractor selectionCost and programme control
See also: Mobilisation, Extension of time, Bill of quantities
- Prime cost sum (PC sum)
An allowance in the contract for goods or work from a supplier or specialist not yet chosen, such as sanitaryware, kitchen appliances or ironmongery. The final cost replaces the allowance, with the contractor's agreed mark-up. Low PC sums make a bid look cheaper than it is. Check each allowance against the quality you actually expect to choose.
Read more: Cost and programme controlHow to choose a villa contractor
See also: Provisional sum, Nominated subcontractor, FF&E
- Programme
The contractor's timetable for the works, showing activities, durations, dependencies and the completion date, usually as a bar chart. A good programme also shows when the owner must make decisions and when approvals are needed. It should be updated regularly against actual progress. Without a realistic, maintained programme, delay claims become arguments with no evidence on either side.
Read more: Cost and programme controlSite visits and reportingHow long it takes to build a villa in Dubai
See also: Critical path, Extension of time, Liquidated damages
- Provisional sum
An amount included in the contract for work that cannot yet be fully defined, such as piling where ground conditions are uncertain, or a feature still being designed. It is adjusted to the actual cost once the work is defined. Large or numerous provisional sums mean the price is less fixed than it looks, so ask what each one covers and how it will be valued.
Read more: Cost and programme controlUAE villa construction contracts
See also: Prime cost sum, Lump sum, Contingency
Q
- Quantity surveyor (QS)
A construction cost specialist who measures and values work. On the owner's side a QS may prepare cost plans and bills of quantities, value interim payments and variations, and agree the final account. Contractors employ their own. On a villa, the owner's consultant often provides the cost role. Check who is actually doing it, and for whom.
Read more: Cost and programme controlOwner's rep vs project manager vs consultant
See also: Bill of quantities, Final account, Interim payment
R
- Remeasure
A contract, or part of one, where the work is measured as built and paid at agreed rates, so the final cost moves with the quantities. It suits work that cannot be fully defined at the start, such as excavation or piling. The quantity risk sits mainly with the owner, so you need reliable measurement and a clear record of what was actually done.
Read more: UAE villa construction contractsCost and programme control
See also: Lump sum, Bill of quantities, Daywork
- Request for information (RFI)
A formal written question from the contractor to the design team, asking for missing information or for a conflict in the drawings to be resolved. A steady flow of RFIs is normal. A flood of them points to incomplete design, and slow answers can support a delay claim. A log of RFIs, with dates raised and answered, is a useful health check on any project.
Read more: Site visits and reportingVariations, delays and claims
See also: Shop drawings, Extension of time, Design development
- Retention
A percentage held back from each payment to the contractor, as security for completion and defects. Typically part is released at completion and the balance at the end of the defects liability period. The percentage is negotiated. What matters most is that the contract says clearly how much is held, when each part is released and on what conditions.
Read more: UAE villa construction contractsSnagging and handover
See also: Defects liability period, Interim payment, Practical completion
S
- Setback
The minimum distance a building must be kept from a plot boundary, set by planning regulations and the master developer's guidelines and shown on the plot documents. Setbacks, height and plot coverage together define the space a villa can occupy. In Abu Dhabi, DMT's September 2025 amendments to the private villa regulations include a 1.5 metre front setback.
Read more: Plot due diligenceBuying a villa plot: the checks
See also: Plot coverage, Affection plan, Department of Municipalities and Transport
- Shop drawings
Detailed drawings produced by the contractor or a specialist, showing exactly how an element will be made and installed, such as joinery, glazing, stairs or MEP routes. The owner's consultant reviews them against the design before work proceeds. Owners should see shop drawings for anything visible and important to them, because this is the last cheap moment to change it.
Read more: Site visits and reporting
See also: As-built drawings, Method statement, Request for information
- Shoring
Temporary support to the sides of an excavation, for example for a basement, so that the ground, neighbouring plots and roads do not move while the permanent structure is built. On waterfront plots with a high water table it usually goes with dewatering. In Dubai's residential procedure, shoring and foundations are among the staged inspections. It is a common early cost surprise.
Read more: Villa construction project managementVilla construction cost in Dubai
See also: Method statement, Provisional sum, Building permit
- Snagging
Identifying and recording defects and unfinished items near the end of a build, such as cracked tiles, poor paintwork, leaks or equipment that does not work, so the contractor can put them right. It should be systematic, room by room, with photos and agreed dates. Snags found later fall under the defects liability period, which is why a thorough snag before handover matters.
Read more: Snagging and handoverVilla snagging checklist
See also: Handover, Defects liability period, Commissioning
- Specification
The written description of the materials, products, standards and workmanship required, which sits alongside the drawings. A vague specification lets a contractor price low and build down. A precise one names products or performance standards and how work will be tested. Most cost differences between bids trace back to what the specification left open.
Read more: Consultant and contractor selectionWhat the contractor knows
See also: Bill of quantities, Prime cost sum, Value engineering
- Subcontractor
A firm employed by the main contractor to carry out part of the work, such as waterproofing, aluminium and glazing, MEP or joinery. On most villas much of the work is subcontracted. The main contractor remains responsible to the owner for its subcontractors. Owners should know who the key ones are, because their quality and payment problems become the project's problems.
Read more: Consultant and contractor selectionHow to choose a villa contractor
See also: Nominated subcontractor, Method statement, Programme
T
- Taking over
The FIDIC term for the point at which the owner takes over the completed works, confirmed by a taking-over certificate. Like practical completion, it usually releases part of the retention, stops delay damages and starts the defects notification period, and it is often the date from which decennial liability is counted. The contract sets the tests that must be passed first.
Read more: Snagging and handoverUAE villa construction contracts
See also: Practical completion, FIDIC, Decennial liability
- TAMM
The Abu Dhabi government services platform, through which the municipalities issue building permits for villas in the emirate. As in Dubai, applications are normally made by the registered consultant or contractor. Abu Dhabi has also moved certain inspection steps to digital reports: from October 2026, certified joint reports replace phase-closure permits for designated categories.
Read more: Design and approvalsAbu Dhabi villa permits through TAMM
See also: Department of Municipalities and Transport, Building permit, Consultant
- Tender
The process of inviting contractors to price the same defined scope so that bids can be compared fairly and a contractor chosen. A good tender gives every bidder the same drawings, specification and contract terms, and asks for prices in the same format. The owner appoints the winner. Eastbridge helps owners compare bids like-for-like and choose, alongside their consultant.
Read more: Consultant and contractor selectionHow to choose a villa contractor
See also: Bill of quantities, Specification, Letter of intent
- Trakhees
The regulatory arm of Dubai's Ports, Customs and Free Zone Corporation (PCFC). Its Civil Engineering Department issues building permits and carries out inspections in the areas it regulates. With Dubai Municipality and the Dubai Development Authority, it is one of the authorities on Dubai's unified building permit window. Which authority covers your villa depends on where your plot sits.
Read more: Design and approvals
See also: Dubai Municipality, Dubai Development Authority, Building permit
V
- Value engineering (VE)
A structured review of a design to keep the function and quality the owner wants at lower cost, for example by simplifying structure or rationalising MEP. Done early, it saves real money. Done late, or used as a label for cheaper materials, it simply cuts quality. Ask for every proposed saving in writing, with what changes and what it saves.
Read more: Cost and programme controlDesign and approvals
See also: Design development, Specification, Contingency
- Variation
A change to the work described in the contract, whether an addition, omission or change in specification. Some contracts call it a change order. Variations should be instructed in writing by whoever the contract authorises and priced before the work is done, not argued over afterwards. Unmanaged variations are the main reason villa budgets overrun.
Read more: Variations, delays and claimsUAE villa construction contracts
See also: Daywork, Extension of time, Final account
W
- Warranties and guarantees
Written promises from the contractor, specialists or manufacturers about the performance of particular work or products, such as waterproofing, roofing, glazing or air conditioning equipment, often for periods longer than the defects liability period. Collect them at handover, check who gives them and what voids them, and keep them with the as-built drawings and manuals.
Read more: Snagging and handoverVilla snagging checklist
See also: Handover, Decennial liability, As-built drawings
Sources
- Dubai launches single window for building permits (Dubai Municipality)
- Residential buildings: building permits procedures (Dubai Municipality)
- Dubai Municipality launches the Building in Dubai platform (Dubai Media Office)
- Dubai AI system for villa construction permits (Khaleej Times)
- Dubai issues new law regulating engineering consultancy activities (Al Tamimi)
- Guidance contract forms for private villas (Dubai Municipality)
- Amendments to private villas regulations (Abu Dhabi Department of Municipalities and Transport)
- Streamlined permit process for minor works (Abu Dhabi Department of Municipalities and Transport)
- Decennial liability in the UAE: a commentary (Al Tamimi)
- PCFC newsletter, issue 37: Trakhees services (Ports, Customs and Free Zone Corporation)
- Villa build cost calculator (Real Estate Club Dubai)
- Owner's representative vs project manager in the UAE (PRASOON, citing Turner & Townsend)
Definitions reflect common usage and the official sources listed. Rules and procedures change, and your contract governs your project. Last reviewed October 2026.
A term in your contract you are not sure about?
Send it to us. We will explain how it usually works in practice and what to ask about it. For its legal effect on your contract, take advice from a UAE-qualified lawyer.